Laserfiche WebLink
Stipulation No. 5 <br /> CWI shall continue to maintain rain gage and evaporation pan monitoring at <br /> or near the CWI wellfield. The rain gage shall record daily and the <br /> evaporation monitor shall record evaporation monthly when not frozen. <br /> Resolved: This stipulation is currently found as Stipulation No. 30 in <br /> the 1988 document. <br /> Stipulation No. 6 <br /> CWI shall submit a plan to monitor any water quantity changes as a result <br /> of changing the overland ditch point of diversion to West Roatcap Creek. <br /> The plan shall be submitted within 120 days of permit issuance. <br /> Resolved: A plan was submitted January 14, 1986, but it was not <br /> implemented due to confusion following the mine fire in June 1988. This <br /> stipulation is currently found as Stipulation No. 31 in the 1988 document. <br /> -17- <br />