My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-02-19_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
1992-02-19_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 2:44:11 PM
Creation date
11/21/2007 2:02:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/19/1992
Doc Name
Midterm Review Findings Document
From
MLRD
To
CYPRUS ORCHARD VALLEY COAL CORP
Type & Sequence
MT2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Six stipulations were attached to the June 20, 1985 Permit No. C-038-83. <br /> These stipulations and their status are listed below. <br /> Stipulation No. 1 <br /> CWI shall submit right of entry information to MLRD for all <br /> surface-affected lands within the permit area prior to extracting coal <br /> beneath these lands or otherwise affecting them. <br /> Resolved: This stipulation is currently listed in the 1988 Permit Renewal <br /> Stipulations . It was mislabeled as a second Stipulation No. 26 in the <br /> 1988 document. It should be recorded as Stipulation No. 27 in the 1988 <br /> document. <br /> Stipulation No. 2 <br /> CWI shall complete the on-the-ground field verifications of surface water <br /> resources on those lands for which right of entry has not been obtained. <br /> The results of the survey shall be approved by the Division prior to CWI <br /> undermining or otherwise affecting these lands. <br /> Resolved: This stipulation is currently found as Stipulation No. 28 in <br /> the 1988 document. <br /> Stipulation No. 3 <br /> One year after the completion of reclamation activities at the loadout, <br /> the operator shall compare the soil characteristics of the reclaimed area <br /> with the adjacent undisturbed orchard areas to verify that the hydrologic <br /> function of flood irrigability has been restored. Such comparison should <br /> be in the form of infiltration, permeability and texture studies. <br /> Resolved: This stipulation appeared as Stipulation No. 1 in the 1983 <br /> document and is currently found as Stipulation No. 26 in the 1988 document. <br /> Stipulation No. 4 <br /> The operator shall continue to submit to the Division an annual report of <br /> inflows , discharges , and consumption of water within the mine . This <br /> report is to include a mine workings map showing the location and quantity <br /> of inflows ; a table keyed to the mine map which shall contain the source <br /> (i .e. fault, fractures , etc . ) , quantity, duration and quality ( i .e . pH, <br /> electro-conductivity and temperature) of all measurable inflows ; a table <br /> containing records of water imported for use within the mine; a discussion <br /> of the water balance within the mine; and finally, a projection of <br /> hydrologic impacts of mining in the upcoming year. The mine inflow study <br /> shall be conducted during the month of June. If the occurrence of inflows <br /> becomes significantly greater than the anticipated rates , the Division may <br /> require that an additional inflow study be conducted at another time <br /> during the year. <br /> Resolved : This stipulation appeared as Stipulation No. 21 in the 1981 <br /> document, No. 2 in the 1983 document and is currently found as <br /> Stipulation No. 29 in the 1988 document. <br /> -16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.