My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-10_REVISION - M1994121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994121
>
2003-12-10_REVISION - M1994121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:42 AM
Creation date
11/21/2007 1:58:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994121
IBM Index Class Name
Revision
Doc Date
12/10/2003
Doc Name
Reevaluation of Amount of Required Bond
From
DMG
To
Lucio Vasquez
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 12/09/2003 <br />User: ESC <br />State :Colorado <br />County :Boulder <br />Site :Vasquez Quarry #2 <br />Agency or organization name :Division Of Minerals & <br />Permit or other job action :Reevaluate amount of <br />Task description :Redistribute Top: <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />bond <br />PermiUjob# : M-1994-121 <br />Abbreviation :none <br />Filename : M121-002 <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank riooer <br /> Utilization <br />Ownership cosUhour : $50.90 NA <br />OperatingcosUhour : $69.48 100 <br />Ripper op.cosUhour : $1.00 10 <br />Operator cosUhour : $31.83 NA <br />Total unit cost/hour : $153.21 Total Fleet cosUhour <br />$153.21 <br />Initial Swell Loose <br />volume: 1,047 LCY factor : NA volume: 1,047 LCY <br /> <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors _::: <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fil/ or embankment Spoil pile : 0.60 (fnd-si) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,300 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.23 <br />Weight description <br />Decomposed rock - 25 % Rock, 75 % Earth <br />8SU <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 310 <br />145.55 <br />145.55 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 7.19 Hours <br />Unit cost : $1,053 /LCY Total job cost : $1,102 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.