Laserfiche WebLink
User : ESC Abbreviation <br />Filename <br />Agency or organization name :Division Of Minerals & <br />Permit or job action :Reevaluate amount of <br />NO. <br />001 <br />002 <br />003 <br />004 <br />Affected Areas <br />TASK <br />includes inflation (actor adjustment of: NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Llabillty IRSUfanCe : 1.55 % Of d12Ct total = $101 <br />Performance bond : 1.05 % ofdirect total = $68 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $649 <br />• nat n~uin:d (or eqp. operator serves as super) TOTAL O 8 P = $818 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $7,311 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclama8on management and/or administration : 5.00 % of cntr. NA total = $366 <br />CONTINGENCY- NA' NA total= NA <br />•rnnUngencies accounted ror at task level TOTAL INDIRECT COST= $1,184 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $7,677 <br />CIRCES Cost Estimating Software <br />PROJECT IDE NTIFICATION <br />Task # : 001 <br />Date : 12/09/2003 <br />User : ESC <br />County :Boulder Abbreviation :none <br />Site :Vasquez Quarry #2 Filename : M121-001 <br />Agency or organization name :Division Of Minerals & Geology <br />Permit or other job action :Reevaluate amount of required bond <br />Task description :Backfill Overburden Stockoi <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8SU <br />Blade type :Semi-Universal <br />iachment no. 1 : ROPS Cab <br />State :Colorado <br />none State :Colorado <br />M121-000 County :Boulder <br />Geology <br />required bond <br /> FORM FLEET TASK DIRECT <br /> USED SIZE HOURS COST <br /> dozer 1 14.4 $2,226 <br /> dozer 1 7.1 $1,102 <br /> revege 1 8.0 $2,273 <br /> mobilize 1 3.2 $892 <br /> <br />SUBTOTALS <br />TOTAL DIRECT COST <br />Horsepower: 310 <br />PermiUjob# : M-1994-121 <br />