Laserfiche WebLink
MAJOR DISTURBANCE <br /> Unit Unit <br /> $!m ILMI QuantityPrice Price <br /> Scarify prior to <br /> placement of topsoil Acre 0.56 $725.00 $ 406.00 <br /> Spread 12" topsoil C.Y. 2,517 $ 1.25 $ 3,146.25 <br /> Seeding, fertilizing, <br /> mulching Acre 1.56 $500.00 $ 780.00 <br /> Re-seeding Acre 0.39 $500.00 $ 195.00 <br /> Trees Each 5 $ 40.00 $ 200.00 <br /> Shrubs Each 10 $ 25.00 $ 250.00 <br /> TOTAL $ 4,977.25 <br /> Notes/Description <br /> Scarify prior to placement 0.56 acres of overburden/topsoil stockpiles <br /> of topsoil <br /> Spread 12" of topsoil 1.56 acres shoreline and stockpile areas <br /> Seeding, fertilizing, 1.0 acres graded shoreline above waterline. <br /> mulching 0.56 acres where overburden/topsoil stockpiles have <br /> been removed <br /> Re-seeding (25%) 0.39 acres non-acceptable germination <br /> L-2 <br />