My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-12-31_REVISION - M1982131
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982131
>
1992-12-31_REVISION - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 9:47:23 AM
Creation date
11/21/2007 1:57:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
Revision
Doc Date
12/31/1992
Doc Name
LETTER OF TRANSMITTAL
From
TUTTLE APPLEGATE INC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> RECLAMATION COSTS <br /> As mentioned in Exhibit D, only a portion of the site is disturbed at any time due to mining <br /> in stages and concurrent reclamation. This Mining Plan has been designed to limit the <br /> amount of handling of the topsoil and overburden material. <br /> In order to calculate the reclamation costs at any given time, we have selected two mining <br /> stages in Phase 2 of area A. Area B would be considered to still be in use. <br /> As stated in Exhibit D, Area A will be mined at a 31-1:1 V slope. No backfilling of the pond <br /> slopes will occur. <br /> If an operator default occurs, the dewatering pumps will be turned off and the pit will fill <br /> with groundwater. Therefore, any disturbed ground below the final lake elevation is not <br /> included in this cost estimate. Area B would be leveled, scarified, topsoiled with six <br /> inches of growth medium, and seeded. <br /> Summary of Reclametlon Costs <br /> Major Disturbance $ 4,977.25 <br /> Moderate Disturbance $ 31,245.75 <br /> Minor Disturbance $ 25,461.25 <br /> TOTAL RECLAMATION COSTS $ 61,684.25 <br /> Administrative Fee (15.8%) $ 9,746.11 <br /> Proposed Reclamation Bond $ 71,450.00 <br /> 1 Bonded Cost per Acre at 33.16 Acres $ 2,154.70 <br /> L-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.