Laserfiche WebLink
i <br /> <br />ROADABLE EQUIPMENT: <br />__________________ Total Eqp. <br />Machine Description Cosc/hr <br /> <br />Flee[ Size Raul Trip Return Trtp <br />(no. hauled) Cost/hr Cost/hr <br />sheet 2 of 2 <br />Subcota is 50.00 50.00 <br />_________ _________ <br />MOB DEMOB SUPPORT EQUIPMENT: <br />"" "~-"" """ " """' Nerght Ownership Raul Rig Fleet Size Haul Ttip Recurn Trip DOi Permit <br />Non-Roadable Eqp. Deacripc ion Itonsl Cost/hr Cost/hr Ino. hauled! Co9t/hr Cosc/hr Cost/ea <br />subcocal9 so.oo so.oo so.oD <br />Total Eqp. Fleet Size Haul Trip Return Trrp <br />Roadable Eqp. Description Cost/hr (no, hauled) Cos[/hr CoatJhr <br />Subtotals 50.00 50.00 <br />EQUIPMENT HAUL DISTANCE fi TIt~@ <br />Nearest major eicy or corn within project area region: Steamboat Springs <br />____________________ <br />________ <br />______ <br />________ <br />Total one way travel dl9tante - 10 <br />__-_ .0 <br />__ mile9 . Average travel speed - <br />______ J0.00 <br />_______ mph. <br />Job Time - Non Roadable Equip.- 0. 50 hours load Roadable Equip.• N/A hours load <br />0. 31 hours haul 0.33 hours haul <br />0. 50 hours unload N/A hours unload <br />0. 37 hours return O.13 hours recurn <br />JOB COST <br />Total Mob/Demob Cos[ 51,258.8] <br />NOTE: Non-roads ble equ ~pmenc Ihaul rig required [o [ra nsportl mob/demob costs based on 2 round [rips, each trip <br />consisting of a one-way loaded haul and a one-way empty recurn. Roadable equipment Ino haul rig requ iredl <br />costs based on one round trip. Colorado DOT requires special permits Eor owe rsrze ecp~ipmen[ on certain <br />spec tf Ted roatl segments within the State. Separate permits are required for each rig on each loaded cr ip. <br />Additionally, paloc cars lone oc two per rig depend in9 on degree of overs izel are also required for o~ecs rze <br />equipment hau Ling, and loading/unloading 'times muse be increased substancia lly for ecpiipment which muse be <br />par<lally dismantled for transport and re-assembled at the job site. Costs for lifting equipme nc antl ocher <br />support equipment needed Eor [his work should be inc Luded in the mob/demob costs. <br />