Laserfiche WebLink
. . <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBSLIZATION <br />Task p... 9 Prep. by CLK Fi Lename..M040-6 <br />~ Date..... 26-Nov-97 Permit p M-B6-090 Mine. .....Beat Rivet S6G <br />PermiC A<(lon........ Recalculation of Financial Narranty <br />Task Description..... Mob/demob equipment to site <br />HOURLY EQUIPMENT COST <br />••--••---•••-•••-•••- NOTE - This !s a list Co select from, nor a llst of mandatory items to include. <br />Mob/Demob Eqp. -TYactor fix4, ]5,000 1D CVH, 779 NP, diesel powered <br />-LC. Trailer 25 Con folding gooseneck, drop deck <br />-Med. Trailer 50 eon folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Cat : On-highway light duly Crvck, 9x2, 130 hp, 1/2 ton rating, ga ;olive powered <br />-Hyd. Crane Grove RT58D rough terrain hydrau Lic crane. 20 Con capacity, L29 hp, 60 ft. boom <br />-Fuel Trvck 6x9, 7,600 gallon capacity, 210 HP, diesel powered <br />-Cube Trvck 6x9, 2,500 gallon capacity, 210 HP, diesel powered <br />-Platbed Truck: 20,000 lb GVN, 179 HP, diesel powered <br />Las[ UPdate: __________________________________________ ________________ __..______________ __________ <br />December, 1994 <br />""""-"""'""' LC. Rig Med.Rig Hvy.Rig Pilo[ Hydraulic Fuel Lube Flatbed <br />Cos[ Breakdom: <45 T. 26-BO i. > 90 T. Car Crane truck Truck Truck <br />Ownership Cost/ht - $25.36 527.62 571.12 51.72 521.81 $6.]B 512.48 59.81 <br />Operating Cost/hr - 525.78 527.19 529.7] 55.23 528.60 $18.12 $24.11 $].9B <br />Operator Coat/hr - 521.90 521.0] 522.07 521.24 52].13 521.24 521.24 521.24 <br />Xe ]per Cos[/hr $20.60 521.29 521.29 50.00 50.00 50.00 50.00 50.00 <br />Total $93.12 $98.23 5104.12 $28.19 5]3.99 $96.19 597.83 $35.03 <br />NON-ROAOABLE EQUIPMENT: <br />'"'-"""'"'"""'_'""' Height Ownership Naul Rig Fleet S ize Haul Trip Return Trip DOT Permit <br />Machine Deseript ion (tons) Cosc/hr Cost/hY Ino. hauled) Cost/hr CosC/hr Cosclea <br />Cat DBN 40.00 $40.05 $98.27 2 52]fi .56 $196.96 <br />Reveg Equipment 15.00 570.00 593.12 1 512].12 593.12 <br />SuDtotal5 $799.68 5289.58 $0.00 <br />_________ _________ _________ <br />