Laserfiche WebLink
2 DMSiON ONE <br />'c OF THE STATE ENGINEER <br />of Water Resowcea <br />tent r# Natural Resources <br />9° Street Suite 200 <br />dey, Colorado 80631 t/J ~ <br />ne (970) 352.87f2 ~~ ~ ~'~ <br />(970)392-1816 w ? ~'~ <br />~/ <br />rod Faucher <br />operations Manager <br />Dveland Ready-Mix Concrete, Inc. <br />.0. Box 249 <br />cveland, CO 80539-0299 <br />February 1, 2006 <br />Lining Test of Pond ~2 (East Pond) <br />N''/z, Seccfion 16, TSN, R69W <br />Water Division 1, Water District 4 <br />Case No. 98CW431 <br />82d: <br />.~ `~" <br />26 ~ <br />919 Ovbne <br />Gavemor <br />Russell Ceoi9e <br />ExenrtNe Din!COr <br />Mal D. Simpson, P.E <br />State Engineer <br />lames R. Mall, P.E <br />Division Cna Engineer <br />RECEt'~/ED <br />APR 2 8 2006 <br />Division of Minerah and Geology <br />s letter is in response to your letter dated January 20, 2006 and the information enclosed with that letter <br />ated to the above referenced lining test. The informaticn was submitted in response to our discussions at <br />initial site visit on January 6, 2006. I have reviewed this information and your letter. Based on this review, <br />ave calculated the design standard leakage for this pit to be 3,085 cubic feet of water per day or 16 gpm. <br />performance standard is therefore 9,255 cubic feet of water per day or 48 gpm. If this pit meets the <br />sign standard, all water inflows and outflows for this pcnd must be accounted for on a monthly basis. If this <br />meets the performance standard, all water inflows and outflows far this pond must be accounted for on a <br />Wkly basis. <br />call me if you have any questions. <br />.dac <br />Fred Renner, Water Commissioner <br />Sincerely, <br />David L. Nettles, P.E. <br />Assistant Division Engineer <br />