My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33601
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:59 PM
Creation date
11/21/2007 1:50:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Enforcement
Doc Date
5/5/1980
Doc Name
ROCKCASTLE CO PN 78-45 OSM NOV 80-5-5-5 ISSUED 04/11/80
From
MARCH MARCH MYATT KORB & CARROLL
To
MLRB
Violation No.
CV0000000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' , <br />Page 2 of 13 <br />Permit No. CO-003565'I <br />A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />.',, 1. Effluent Limitations <br />yY,.,~ <br />`•i. <br />":'' During the period beginning immediately and lasting through the <br />~'~~ duration of the permit, there shall be no discharge from outfall <br />001 except for those allowed under the emergency bypass require- <br />:i: i ) menu Part 11 A.S. and Part III "Additional Bypassing requirements" <br />• Any untreated overflow from facilities designed, constructed, and <br />operated co treat mine drainage and [hc runoff at the treatment <br />facility resulting from a 10-year, 24-Hour precipitation even[ <br />shall not be subject to the above conditions. ~; <br />,~:,., Ten-year, 24-hour precipitation even[ shall mean the maximum 24-hour <br />~.~' precipitation evenC with a probable reoccurence interval of once <br />,,, every 10 years. The~10-year, 24-hour precipitation event For this <br />facility shalt be i.8 inches. The rain gage of record will be <br />Hayden, Colorado, Index No. 3867. Tlie permittee has the option to <br />maintain and operate a rain gage at the facility. <br />2., Monitoring Requirements <br />If [he permittee is allowed a bypass under Part III of this permit, <br />a monieoriny program will be required. Parameters to be monitored <br />will be specified at the time the bypass is approved. <br /> <br /> <br />5, <br />•v <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.