Laserfiche WebLink
<br /> <br />-2- <br />Snowmass Coal Company is now attempting to construct the emergency spill- <br />way on the pond embankment to the specifications in the approved designed. We <br />also attempted to scrape some dirt out of the bottom of the pond to bring it <br />to the elevation in the approved design. However, our D-8H bulldozer sank <br />into the mud until its tracks were submerged. It required two, front-end <br />loaders, and three hours of work to pull the bulldozer from the pond. <br />If you have any questions or comments, please feel free to call me at <br />the mine office. <br />Sincerely, <br />~,,~''Cb <br />Scott Jones <br />Environmental Coordinator <br />SJ:mgc <br />