Laserfiche WebLink
RUG-21-1999 13 45 FROM ~EIGERS CORPORRTION TO 3038328106 P.03 <br />' '~~ DEMOLITION COST ESTIMAT~ <br />~~ Structure /Facility /Equipment Description Cost <br />Admin and Lab Building Superstructure <br />Hear Exchanger Building Superstructure <br />Compressor Building Superstructure <br />Process Building Superstructure <br />Pumphouse Building Superstructure <br />Fin-Fan Cooler <br />Retum Water Collection Tank <br />Pipeline Feed Surge Tank <br />Substation <br />Package Generator <br />Outdoor Switch Gear <br />Admin Building Slab with Rods <br />Processing Facility Slab with Rods <br />Substation Slab with Rods <br />Package Generator Slab with Rods <br />Outdoor Switch Gear Slab Wdh Rods <br />Nitrogen Pad Slab with Rods <br />Fuel Storage Pad Slab with Rods <br />Spread Footers Various <br />Column Supports Under Processing Facility <br />Above Ground Transmission Line <br />Stormwater Pond Liner <br />Demolish and Remove Asphalt from Access Road <br />Remove Fence Facilities Area and Stomrwater Pond <br />Install Livestock Exclusion Fence 0-5 year Panel <br />Remove Livestock Exclusion Fence 0-5 year Panel <br />Concrete Disposal <br />Total <br />$ 15,437.00 <br />$ 72,939.00 <br />$ 30,585.00 <br />$ 410,281.00 <br />$ 16,672.00 <br />$ 15,630.00 <br />$ 46,556.00 <br />$ 26,188.00 <br />$ 9,455.00 <br />$ 868.00 <br />$ 2,171.00 <br />$ 8,722.00 <br />$ 133,734.00 <br />$ 145,363.00 <br />$ 1,635.00 <br />$ 2,442.00 <br />$ 2,180.00 <br />$ 523.00 <br />$ 32,998.00 <br />$ 1,389.00 <br />$ 18,814.00 <br />$ 2,144.00 <br />$ 139,164.00 <br />$ 5,934.00 3,256 lin.fL x 1.70 + 7.2% <br />$ 8.914.00 7,230 lin.ft. x 1.15 + 7.2 <br />$ 5,968.00 <br />$ 217,422.00 <br />$ 1,374,106.00 <br />This cost estimate includes: <br />Processing Facilities Area <br />1-acre Stormwater Retention Pond <br />Asphalt Road <br />Fuel Storage Area <br />Live Stack Exclusion Fence <br />Above Ground Transmission Line <br />TOTRL P.03 <br />