My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-08-21_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
1999-08-21_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:50 PM
Creation date
11/21/2007 1:49:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
8/21/1999
Doc Name
INTERIM BOND PROPOSAL
From
STEIGERS CORP
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUG-21-1999 13 45 FROM S EiGERS CDRPDRRTION TD <br />-_ ~ONDING COST ESTIMATE <br />TASK <br />3038328106 P.02 <br />Task 4 Backfill and Grade Drill Pads and Associated Roads <br />Task 5 Backfill and Grade Piceance Site Facilities Area <br />Task 7 Backfill and Grade Stortnwater Pond <br />Task B Backfill and Grade Main Access Road <br />Task 9 Backfill and Grade Well Field Service Road <br />Task 17 Backfill and Grade Yellow Cr. Jeep Tr. Realignment <br />Task 6 Finish Grade Piceance Site Facilities Area <br />Task 12 Replace Topsoil Drill Pads and Associated Roads <br />Task 13 Replace Topsoil Piceance Site Facilities Area <br />Task 14 Replace Topsoil Piceance Site Main Access Road <br />Task 15 Replace Topsoil Well Field Service Road <br />Task 1 B Replace Topsoil Yellow Cr. Jeep Tr. Realignment <br />Task 2 Demolition <br />Task 19 Revegetate Grass, Fortis, and Shrubs <br />Task 21 Revegetate Shrubs and Trees <br />Task 1 MobilizelDemobilize <br />Contractors Casts <br />Job Superintendent <br />Contractors Insurance 1.55% <br />Contractors Performance Bond 1.55% <br />Contractors Profit 10% <br />CDMG Administrative Costs 5% <br />( Total less $1,513.46) $171,421.54 <br /> $16,585.00 <br /> $6,332.00 <br /> $127,184.00 <br /> $73,253.00 <br /> $3,286.00 <br /> $876.00 <br />( Total less $755.20) $66,648.80 <br /> $10,019.00 <br /> $20,094.OD <br /> $15,264.00 <br /> $4,830.00 <br /> $1,374,106.00 <br />( Total less $1,802.13) $124,196.87 <br /> $141,993.00 <br />( Total less $863.5D) $16,193.50 <br /> Total $2,172.282.71 <br />( Total less $2,500.00) $21,500.00 <br />0.0155 X $2,172,282.71 $33,670.38 <br />0.0155 X $2,172.282.71 $33,670.38 <br />0.1 X $2,172,282.71 $217.228.27 <br />Total $2,478,351.75 <br />0.05 X $2,478,351.75 $123,917.59 <br />Grand Total $2,602,269.33 <br />Bond <br />Piceance Site Processing Area <br />1-acre Stormwater Retention Pond <br />Main Access Road <br />Well Field Service Road <br />Drill Pads and Associated Roads <br />Yellow Cr. Jeep Tr. Realignment <br />
The URL can be used to link to this page
Your browser does not support the video tag.