My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33500
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:56 PM
Creation date
11/21/2007 1:47:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
9/8/1997
Doc Name
WEST ELK MINE PN C-80-007 NOV CV-97-009
From
MOUNTAIN COAL CO
To
DMG
Violation No.
CV1997009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coal Company <br />West Elk Mine <br />Post Office Box 597 <br />Somerset, Colorado a1434 <br />Telephone 970 929-5015 <br />Fax 970929-5595 <br />September 02, 1997 <br />~EC~iv~~ <br />SEP 0 8 1991 <br />~iY151Cn Oi MlnCrrl~C a uooiq~y <br />Mr. Michael Boulay <br />DIVISION OF MINERALS AND GEOLOGY <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: West Elk Mine, Permit No. C-80-007, NOV No. CV-97-009 <br />Dear Mr. Boulay: <br />iii iiiiiiiuii~~ iii <br />Mountain Coal Company (MCC) has received the termination notices for Notices of Violation <br />(NOV) Nos. CV-97-008 and CV-97-O10. Your telephone messages to both Christine Johnston <br />and I on August 29, 1997, stated that NOV No. CV-97-009 was not terminated because the <br />abatement steps had not been completed. The abatement steps were as follows: <br />1) Provide a detailed mitigation and reclamation plan for the slide and channel area by <br />August 30, 1997. <br />2) Implement the detailed mitigation and reclamation plan by October 31, 1997. <br />Based on the information and discussions provided below, MCC believes that this NOV should be <br />terminated, as well, as the abatement steps have been completed. <br />Per Dr. Pendleton's recommendation, on July 16, 1997, MCC submitted (and the Division <br />subsequently approved) an action plan for monitoring, evaluation and any necessary redesign of <br />this road section and/or of the dewatering borehole road (from alight-use to a haul road). In <br />addition, MCC proposed to carefully remove fill material from the failed area. The approved <br />action plan stated that the approximate date for the submittal to CDMG of evaluations and <br />redesign of the failed road section would be October 1997. <br />As stated in the action plan, and MCC's letter of August 11, 1997, to Michael Long requesting <br />that he vacate all three violations, MCC has been closely monitoring the failed fill area and have <br />confirmed the failure occurred in the foundation below the fill. Surface survey data shows that <br />very little movement (less than 2/10 of a foot) has occurred at any surface location and the stream <br />remains un-damaged and in free-flowing condition. MCC has also lowered the road fill elevation <br />by several feet and has also "benched" areas of the outslope. At this time, MCC's approved <br />reclamation plan (per PR 07) remains unchanged for both the fill area and the stream buffer zone. <br />
The URL can be used to link to this page
Your browser does not support the video tag.