My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-03-15_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2004-03-15_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:38 PM
Creation date
11/21/2007 1:46:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
Revision
Doc Date
3/15/2004
Doc Name
Adequacy Concerns
From
DMG
To
JR Engineering
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : pot <br />Date : 03/15/2004 <br />User : BMK <br />State :Colorado PermiUjob# : M-1980-183 <br />County :Adams Abbreviation :none <br />Site :Brannon Sand And Gravel Filename : M183oo1 <br />Agency or organization name : DMG <br />Permit or other job action :AMENDMENT <br />Task descdption :REGARDS PIT WALLS TO 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - SU <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank rioper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.14 NA <br />Operating cosUhour : $69.76 100 <br />Ripper op.cosUhour : $2.49 25 <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $155.22 Total fleet cost/hour : $155.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 400,000 CCY factor : 1.125 volume : 450,000 LCY <br />Source of estimated volume :PAGE 14 <br />Source of estimated swell factor :EXHIBIT L <br />HOURLY PRODUCTION <br />Average push distance : 250 feet <br />Unadjusted howdy production : 400.0 LCY/hr <br />Matedal consistency description <br />Consolidated stockpile <br />Average push gradient : 3.00 % (r <br />Average site altitude : 5,200 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Basalt <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost: $1.046 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.07 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.37 <br />Source <br />Adjusted unit production : 148.44 LCY/hr <br />Adjusted fleet production : 148.44 LCY/hr <br />Total job time <br />Total job cost <br />3031.45 Hours <br />$470,552 <br />
The URL can be used to link to this page
Your browser does not support the video tag.