My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-03-15_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2004-03-15_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:38 PM
Creation date
11/21/2007 1:46:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
Revision
Doc Date
3/15/2004
Doc Name
Adequacy Concerns
From
DMG
To
JR Engineering
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado <br />Date <br />User <br />03r15/2004 County :Adams <br />BMK Site :Brannon Sand And Gravel <br />Agency or organization name :OMG <br />Permit or other job action :AMENDMENT <br />Task descdption :APPLY TOPSOIL <br />. ..>. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 1/- 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank dpper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosUhaur : $51.14 NA <br />Operatingcost/hour : $69.76 100 <br />Ripper op. cosUhour : $2.49 25 <br />Operator cosUhour : $31.83 NA <br />Total unit cosf/hour : $155.22 Total fleet cosUhour : $155.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 24,500 - CCY factor : 1.215 volume : 29,768 LCY <br />Source of estimated volume :EXHIBIT L <br />Source of estimated swell factor : CA TS HAND BOOK <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCYIhr <br />Material consistency descdption <br />Consolidated stockpile <br />Average push gradient : 3.00 % (i <br />Average site altitude : 5,200 feet <br />Matedal weight : 3,300 Ibs1LCY <br />Weight description <br />Basalt <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.07 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.37 <br />Adjusted unit production <br />Adjusted fleet production <br />148.44 <br />148.44 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 200.53 Hours <br />Unit cost : $1.046 /LCY Total job cost : $31,127 <br />Pennitfjob# : M-1980-183 <br />Abbreviation :none <br />Filename :M183-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.