Laserfiche WebLink
<br /> <br />~y <br />V. Status of Problem Resolution <br />The following items concern problems identified at previous <br />S.iispections. Problems are classified into two categories. <br />These are: (1) problems resolved; and (2) operator <br />delinquent. The date that the problem is resolved or the date <br />that the operator is deemed delinquent is to be clearly stated. <br />PROBLEM RESOLVED PRIOR TO INSPECTION <br />83-2. Pond inspection repot requirements need to be <br />completed as per Rule A.05.6(11) fo[ the first quarter of <br />1983. The required reports have been submitted. <br />RESOLUTION IN PROGRESS <br />82-5. Submit a revision requesting release of liability from <br />the areas to be disturbed by the Hlyhway Depactment. - iIo <br />deadline imposed. <br />83-1. The permit boundary around the mine surface facilities <br />and loadout should be clearly marked by May 1, 1983. (Many <br />markets ate in place, but more ate needed.) <br />Problem 83-5 resolved. <br />Problem 83-6 resolved <br />Problem fl3-7 resolved <br />Problem 83-8 resolved. <br />~v <br /> <br />