My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33408
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:54 PM
Creation date
11/21/2007 1:45:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
2/16/1983
Doc Name
COAL INSPECTION REPORT
Violation No.
CV1983007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />IV. Problems, Recommendations and Compliance Dates <br />The operator is advised that the following problems have been <br />identified during inspections and that failure to correct the <br />problems may result in the Division taking an ENFORCEMEtdT <br />ACTION pursuant to CRS 1973, as amended, 34-33-123. <br />(Recommendations and compliance dates are to be clearly noted. <br />Dates are to be specific, e.g., January 31, 1983 and <br />underlined.) <br />83.3 The operator needs to control adjacent runoff north of <br />the topsoil stockpile to stablli.ze rills that have formed on <br />the access road cut slope (see comment le) by April 15, 1983 if <br />weather permits. <br />83-4. The portal pad should be regraded or bermed to prevent <br />water from flowing over its outslope (see comment la) by Apr11 <br />15, 1983. <br />83-5. The runoff from the breaker building should be <br />controlled to prevent discharge Snto the adjacent spillway <br />channel (see comment lb) by March 1, 1983. <br />83-6. The culvert adjacent to ttie refuse pile should be <br />cleared (see comment lc) by March 1, 1983. <br />83-7. The cross-over culvert should be opened to allow <br />disturbed drainage to reach pond MB A2 (see comment lb) <br />immediately. <br />83-3. The portal pad drains should be opened by March 1, <br />1983. <br />A• <br />
The URL can be used to link to this page
Your browser does not support the video tag.