Laserfiche WebLink
Table E-2: Reclamation Timetable (cont.) <br />Stage C <br />Task # escription ime needed <br />ears <br />1 Strip topsoil from Phase 6, mine Phase 5, reclaim Phases A4 and <br />4 1.39 <br />2 Stri to soil from Phase 7, mine Phase 6, reclaim Phase 5 1.79 <br />3 Stri to soil from Phase 8, mine Phase 7, reclaim Phase 6 .43 <br />4 Stri to soil from Phase 9, mine Phase 8, reclaim Phase 7 .21 <br />5 Stri to soil from Phase 10, mine Phase 9, reclaim Phase 8 1.92 <br />6 Stri to soil from Phase 11, mine Phase 10, reclaim Phase 9 1.09 <br />7 Stri to soil from Phase 12, mine Phase 11, reclaim Phase 10 0.99 <br />8 Strip topsoil from Phase 13, mine Phase 12, reclaim Phase 11 0.32 <br />9 ine Phase 13, reclaim Phase 12 - 0.04 <br />10 eclaim Phase 13 0.02 <br />Total 12.20 <br />Haldorson Sand and Gravel Mine 26 <br />