Laserfiche WebLink
2. Reclamation Timetable <br />Table E-2: Reclamation Timetable. <br />Stage A <br />Task # escri lion ime needed ears <br />1 Stri to soil from Phase Al 0.02 <br />2 Stri to soil from Phase A2, and mine Phase Al .75 <br />3 Strip topsoil from Phase A3, mine Phase A2, and reclaim Phase <br />1 .67 <br />4 Strip topsoil from Phase A4, mine Phase A3, and reclaim Phase <br />2 5.02 <br />5 Strip topsoil from Phase 5, mine Phase A4, and reclaim Phase <br />3 5.40 <br />Total 19.84 <br />Stage B <br />Task # escription ime needed <br />ears <br />1 Stri to soil from Phase B1, Remove houses from Phase B1 0.02 <br />2 Stri to soil from Phase B2, and mine Phase B 1 .78 <br />3 Strip topsoil from Phase B3, mine Phase B2, and reclaim Phase <br />1 .71 <br />4 Strip topsoil from Phase B4, mine Phase B3, and reclaim Phase <br />2. 5.04 <br />5 ine Phase B4, and reclaim Phase B3, Remove houses from <br />hase 5 5.36 <br />Total 19.89 <br />Haldorson Sand and Gravel Mine 25 <br />