Laserfiche WebLink
i <br />124 <br />' 1 applicant? i haven't seen that in there. <br /> 2 Who is to be notified? Only the Mined <br /> 3 Land? Shouldn't the Citizens of San Luis be <br /> 4 informed about it? <br />' <br /> 5 And lastly, what would be the role of <br />' 6 the Mined Land Reclamation Board and the State if <br /> 7 there is contamination detected in the monitoring <br />t 8 holes? I have not seen that. <br /> 9 Steve Hess talked about the water <br /> 10 rights. I'm not going to reiterate too much on <br /> 11 there, but basically I looked at the application and <br /> 12 I have not seen the total water ri <br />hts <br />acka <br />e <br />I <br /> g <br />p <br />g <br />. <br />' 13 have not seen the augmentation plan. <br /> la But it appears, based upon the dates of <br /> 15 adjudication, that those water rights may be junior. <br /> 16 So I would like to hear more information about that, <br />' 17 and I encourage the Board to find out more about <br /> 18 that. <br /> 19 It's my understanding, when I called <br /> 20 down at the engineer's office in Alamosa, that area, <br />' 21 th <br />t th <br />Rit <br />h <br />t b <br />ll <br />l <br />d <br />th <br /> a <br />ere <br />as no <br />upon <br />o <br />een ca <br />s p <br />ace <br />e <br />' 22 Seco in this particular location. But do we have <br /> 23 assurances there will never be calls placed can <br />' 24 there? And I don't know the answer to that, either, <br /> 25 and this is very important because, if there is <br /> <br /> AGREN, BLANDO & BILLINGS <br /> <br /> <br />