Laserfiche WebLink
i~ <br /> 121 <br /> <br /> 1 to be designed, the outlet works, been approved by <br /> 2 the State Engineer's Office? From what I read, it <br />' 3 has not. <br /> 4 The question was asked -- I forget <br /> i <br />h b <br />d <br /> S wh <br />oar <br />c <br />member here -- about what I interpreted <br /> 6 meaning a backup system to the collection pond. <br /> 7 what would happen if the pumps plugged up, for <br />' 8 example? I believe, Mr. Entz, you were the one to <br /> 9 ask the question on it. You never did get an <br />' l0 answer, and that's the same question I have. <br /> 11 what happens if the backup system -- <br />t 12 what happens if the system fails and we start having <br /> 13 a lot of precipitation and we have a lot of water in <br />' 1 t <br />d <br /> 4 own. Do <br />here? We have no way to pull that water <br /> 15 we still have an embankment or do we have a dam? <br /> 16 I think that's a very big question that <br /> 17 needs to be answered. What quality controls will we <br /> 16 have and the Mined Land Reclamation Board can be <br />t 19 assured of and the citizens of the State of olorado <br /> 20 can be assured of, that as we reach the total, reach <br />' 21 the end of our reclamation plan there, that .if we <br />' 22 had a large climatic event, and before the spillway <br /> 23 would be constructed there, that we could safely get <br />' 24 that water around, off those tailings and down like <br /> 25 they are proposing at the end of their plan? I <br /> <br /> AGREN, BLANDO 6 BILLINGS <br /> <br /> <br />