Laserfiche WebLink
<br />portions of natural channel linking segments, from erosion. <br />June 2. 1993: <br />June 10. 1993: <br />June 11. 1993: <br />June 16. 1993: <br />July 7. 1993: <br />July 8. 1993: <br />~(3b) Repair and stabilization of natural channel linking segments of <br />South Collection Ditch. <br />Abatement due dates: <br />~C3a) June 30, 1993 <br />~3b) implement within 30 days of revision approval by Division. <br />Received Request for Vacation from Colowyo <br />Larry Routten memo to Mike Long concerning Request for Vacation <br />with LPR's recommendation not to vacate. <br />Mike Long letter to Rich Atkinson. <br />Additional information regarding ditch design and flow volumes <br />received from Colowyo. <br />C'iA-~~e-.~niYr~oP-I','w~~. ('2eaa~~l ~cir.~Co~u^.~7.0• -~'~ l g/~(,~93 <br />Proposed Civil Penalty assessed at $2300.00 by DIH <br />Susan Morrison analyzed ditch designs and flow measurements of <br />storm event with SEDCAD. Memo to LPR. <br />Julv 16. 1993: Colowyo submitted Request for Assessment Conference <br />Assessment Conference scheduled for August 17, 1993 9:00 a.m. room <br />623 with Sandy Brown (Assessment Officer). <br />August 2. 1993: Modification signed by Mike Long for; <br />Delete "Nature of Violation" statement- <br />Failure to maintain collection Ditch <br />Failure to maintain an excess spoil pile diversion ditch. <br />Delete regulation citation -4.09.1(5) <br />August 4. 1993: Modification issued by LPR; <br />Delete modification made to the NOV on June 3, 1993. <br />August 11. 1993:NOV terminated by JHB. <br />m: \ coal \j hb\ C81019\NO V C93.077 <br />