Laserfiche WebLink
<br /> <br />August 11, 1993 <br />To: Colowyo (C-81-019) NOV-C-93-077 File <br />From: Janet Binns <br />RE: Synopsis <br />~II ~I~~II~I~~~~~ ~~~ <br />May 18. 1993:NOV-C-93-077 written by DAB for; <br />failure to pass disturbed area flow <br />failure to protect offsite areas, <br />failure to maintain collection ditch <br />failure to minimize additional solids to offsite areas <br />failure to maintain an excess spoil diversion ditch <br />Abatement Steps Required: <br />1) Repair the South Collection Ditch so that it conforms to <br />approved specifications. d;d,, . <br />2) Repair all impacted offsite areas. ~~.~ ~°-t" `5 ~"'"~ ~"`~~ <br />o'+^d o~1j~._e....~- ~o-.,.=,1.~ , -I ~,p~.k~ ,,.~~] ~Lo-rd-o..n~"s . <br />Abatement Due Dates: <br />1) June 15, 1993 <br />2) June 30, 1993 <br />May 24. 1993: Modification added by DAB: Add abatement number 3 as follows: <br />3) Repair excess spoil pile diversion ditch no later than June 30, <br />1993. agyh „~ I~t- <br />w7~L....., w~ /\,.....~ of Yj Cu+..~~J Yi.., ~ "A`7 <br />June 3. 1993: Modification added by SFW: <br />~c"Nature of Violation'; failure to design and maintain collection ditch. <br />X"Portion of the Operation..."; add and linking portions of natural <br />channel <br />Add abatement steps; <br />~C3a) Submit a complete and approvable technical revision for design <br />of South Collection Ditch including the portion of it, and <br />