Laserfiche WebLink
<br />~ ~~ ~~ <br />TST, INC.//CON`S'ULTING ENGINEERS <br />/UN 212007 <br />~pivision of Reclamation, June 20, 2007 <br />Mining and Safety <br />Erica Crosby <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />State of Colorado <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />r/ <br />Re: Technical Revision Application 03 (TR-03) <br />Three Bells Pit, Permit No. M-1979-191 <br />Project No. 0864.0111.00 <br />Ms. Crosby: <br />In regards to the Three Bells Pit, Technical Revision Application 03 (TR-03) we <br />request additional time to reply and address items identified in the Technical <br />Revision Application 03 (TR-03) Adequacy Letter dated May 8, 2007. The <br />original decision date, as outlined in the May 8"' letter was to have been May 26, <br />2007 and we respectfully request an extension to the decision date. We request <br />that the decision date be moved to June 29, 2007. <br />If you have any questions, please feel free to give me a call. <br />Sincerely, <br />TST. INC. CONSULTING ENGINEERS <br />Jesse <br />JB/mgf <br />748 Whalers Way <br />Fort Collins, CO 80525 <br />970.226.0557 <br />me[ro 303.595.9103 <br />fax 970.226.0204 <br />info@uunc.com I ^ <br />www.acinacom <br />