My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32958
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:41 PM
Creation date
11/21/2007 1:34:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/1/1992
Doc Name
TAILINGS PH ADJUSTMENT SYSTEM OPERATIONS REVIEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />r SECTION S.0 <br />MAINTENANCE SAFETY PROCEDURES <br />~~ 8.1 ROUTINE CHECKS <br />Procedures for inspection and maintenance of equipment and <br />instrumentation will be developed by BMGC. Tk~e following <br />list is not complete but includes some of theiitems which <br />will require regular attention: <br />^ checking belt tensions and alignment of driJves, <br />^ checking drive guards, <br />^ inspection of rubber linings in tanks and ~oppers, <br />^ inspecting and tightening of flanges in pipe and ducts, <br />^ calibration of pH meters, <br />J ^ replacement of sensing heads in HCN detector, according <br />J to manufacturer's recommendations, <br />^ calibration of HCN monitor in scrubber stacl~, following <br />J manufacturer's recommended procedures, <br />8.2 SAFETY PROCEDURES <br />J Specific procedures will be developed by BM~C for safe <br />access to and maintenance of equipment in the p Adjustment <br />System. <br />] Potential hazards exist in exposure of personnel to residual <br />concentrations of HCN gas in tanks and vesse s on which <br />~~ maintenance is to be performed. No ope ations or <br />maintenance personnel should enter any tan or other <br />enclosure in the Tailings pH Adjustment Syste until the <br />prescribed safety procedures have been carried ut and the <br />area certified as safe. At no time should any erson carry <br />out inspection or maintenance work inside tankslwithout the <br />knowledge and presence of a second person. <br />} Procedures required to purge all residual tracesof HCN from <br />tanks and hoppers include: <br />~ ^ open drain valves to dump slurry to sumps, <br />' ^ thoroughly wash out vessel to remove all residual <br />slurry, <br />^ open access hatches and thoroughly purge the vessel <br />using forced ventilation. <br />J <br />pj/1517rp 012591 8-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.