Laserfiche WebLink
ti <br /> <br />Mr. George Gregg <br />-2- <br />Topsoil replacement depth of lft using a D9L Caterpiller dozer: <br />March 19, 1985 <br />lft: 43,560ft?/A x lft = 1;613/yd3 x $.60/yd3 = $967.80 x 9.5A = $9,194.10 <br />27ft /y~- <br />Mulching Costs at 2 tons of straw mulch per acre: <br />$100/A x 9.5A = $950.00 <br />Seeding Costs as provided by Arkansas Valley Seed, Inc.: <br />Sandy Soils <br />Switchgrass 2.5 #/A x $4.95/# _ $12.38 <br />Sideoats grams 4.5 #/A x $3.95/# _ $17.78 <br />Fescue 8 #/A x $ .98/# _ $ 7.84 <br />4lkalia Sacaton 1 #/A x $2.45/# _ $ 2.45 <br /> $40.45/A <br />$40.44 x 9.5 A = $384.28 <br />=~eavy Soils <br />Tall Wheatgrass 11 #/A x $ .75 = $ 8.25 <br />Switchgrass 2.5 #/A x $4.95 = $12.38 <br />Smooth brome 13 #/A x $ .59 = $ 7.67 <br />+lestern lJheatgrass 16 #/A x $3.40 = $54.40 <br />$82.70/A <br />$82.70/A x 9. SA = $783.966 <br />;n average cost for seed = 784.00 + 384.28 = $584.14 <br />Total Reclamation costs may range from: <br />Topsoiling costs: $9,194.10 <br />~lulchin9 cost: $ 950.00 <br />Seed cost (avg.): $ 584.14 <br />aft backfilling: $27,588.00; 7ft backfilling: $64,370.10 <br />538,316.24 to $75,098.34 <br />.average = $56,707.29 <br /> <br />'fou may wish to provide us with estimates of the cost of hiring a third party <br />to conduct reclamation efforts, or elect the $56,707.29 Financial Warranty <br />increase to be proposed to the Board. The financial Warranty increase <br />