Laserfiche WebLink
_ _ <br />Phase IVb Weekly Summary No. 32 Page 4 " ' 003-2203 ° ' <br />Laboratorv Tests <br />Golder obtained QA samples of Soil Liner Fill (SLFb-24, 2~, 26 and 27). Laboratory index testing <br />was conducted on samples of Soil Liner Fill (SLFb-23, 24, and 25) to verify suitability of materials <br />used. Laboratory test results for Soil Liner Fill samples SLFb-26 and 27 will be reported in Weekly <br />33. Laboratory test results are presented in Attachment B. <br />MeetinEs <br />CC&V held Weekly Contractors' meetings on September 16 and September 23, 2003. Items <br />discussed included Safety, Environmental, Schedule, and CQA. The next weekly meeting will be <br />held on September 30, 2003 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />-c. ~~ <br />Ron DiDonato <br />Project Resident <br />Peuervbazs~ca~x~io-sm~~tR~~.zooa GolderASSOCiateslnc. <br />