Laserfiche WebLink
Phase' IVti Weekly Summary No. 33 Page 4 _ - ,003-2203 - ' <br />Laborato . Tests <br />Golder obtained QA samples of Soil Liner Fill (SLFx-O1) and Drain Cover Fill (DCFb-18 and <br />DCFb-19). Laboratory index testing was conducted on samples of Soil Liner Fill (SLFb-26, SLFb- <br />27, and SLFx-Ol) and Drain Cover Fill (DCFb-18 and DCFb-19) to verify suitability of materials <br />used. Laboratory test results are presented in Attachment B. <br />Meetings <br />CC&V held Weekly Contractors' meetings on September 30, October 7, and October 14, 2003. <br />Items discussed included Safety, Environmental, Schedule, and CQA. The next weekly meeting <br />will be held on October 21, 2003 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />~ ~~ <br />Ron DiDonato <br />Project Resident <br />an~,waas~~~nea,o~mntrv,xoo3-~„ Golder Associateslnc. <br />