My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-27_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-10-27_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:31:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/27/2003
Doc Name
Weekly Construction Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.SSOCI'I~CS <br />October I, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box ] 91 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 32: September 14 through September 27, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA} services performed for the Cresson Project during the period of September <br />I4 through September 27, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 27° F to 45° F, and highs ranged from 62° F to 81° F. Weather <br />observations were made on eleven days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb <br />construction. Ames conducted Phase IVb construction actvifies on eleven days of this fourteen-day <br />reporting period (September 15 through September 20 and September 22 through September 26). Poly- <br />Flex conducted Phase IVb construction activities on six days of this fourteen-day reporting period <br />(September 22 through September 27). <br />Phase IVb <br />Ames completed contouring and compaction of subgrade Structural Fill (SF) in preparation for Soil <br />Liner Fill (SLF) placement in the Phase IVb OSA on the east-facing slope of Chicken Hawk Hill, west <br />of the PSSA, and at the LOB repair azea. <br />Ames continued excavation of the Phase IVb OSA geomembrane anchor trench at the Phase N b/c tie- <br />in area, and along the west end berm, excavating approximately ]400 lineaz feet of anchor trench in <br />preparation for geomembrane deployment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.