My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32800
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:37 PM
Creation date
11/21/2007 1:30:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
10/16/1992
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS PROJECT PN M-88-112 2 EXECUTED COPIES OF 3RD PARTY SAMPLING
From
DMG
To
PARCEL MAURO HULTIN & SPAANSTRA PC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. Split samples retained by BMRI shall be deemed by DMG to satisfy <br />any normal required sampling effort scheduled to occur within two <br />weeks of the independent sampling event. The DMG and BMRI shall <br />use their best efforts to coordinate sampling activities in such a way as <br />to minimize duplication. <br />C. Sample Collection Procedures <br />1. The third party sampling contractor shall prepare a guideline for the <br />conduct of the sampling, based upon a review of the petmit monitoring <br />requirements and the Sampling and Analytical Protocol (TR-006). <br />2. The third party sampling contractor shall observe BMRI complete <br />sampling and filtering of the collected samples. <br />3. The third party sampling contractor shall accept a split sample to <br />preserve and ship to the analytical laboratory it shall retain for such <br />purpose. <br />4. The third party sampling contractor shall observe the dlecontamination <br />of all sampling equipment, bailing and sample collectjon. <br />5. The third party sampling contractor shall complete an acceptance form <br />for each sample, including its appraisal of whether the sampling <br />technique employed by BMRI conforms with the approved TR No. 006 <br />protocol. <br />6. If the third party sampling contractor refuses to accept geld sample and <br />states a specific objection to it, BMRI shall perform the sampling a <br />second time. If concurrence cannot be reached after resampling, the <br />sample shall be retained and submitted for analysis, butt designated as <br />"rejected" and be considered in dispute. <br />7. The third party sampling contractor shall be responsilale for providing <br />all necessary bottles, reagents, packing, coolers, preservation needs, <br />custody forms, and all other sampling materials as ne$ded to conduct <br />said sampling pursuant to the TR No. 006 protocol. <br />8. The third party sampling contractor shall be responsible for sample <br />preservation, transportation and delivery to the independent analytical <br />laboratory. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.