Laserfiche WebLink
• Historical and operational information for the Boulder Feeder Canal and other <br />irrigation ditches has been collected and assessed; <br />• The monitoring well and piezometer network around C-Pit has been completed, <br />and instrumentation has been installed to track water level data; <br />• Two rounds of groundwater sampling have been conducted, with no evidence <br />of contaminant migration observed; <br />• A down gradient compliance well has been installed in the Fort Hays <br />Limestone unit at the eastern extent of CEMEX's property. <br />In addition, the majority of the exposed water in C-Pit has been eliminated by filling the <br />pit with inert fill, and the remaining water surface (less than one acre) has been covered <br />with netting. <br />Please confirm that the proposed schedule for completing our study and reporting by <br />August 31, 2007 is acceptable. <br />Sincerely, <br />.~G~e~.e~e. ~rrdv~~' <br />Monica Sowders <br />