My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32554
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:29 PM
Creation date
11/21/2007 1:24:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/24/1992
Doc Name
NOV ABATEMENT PLAN
From
MLRD
To
BMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Battle Mountain Gold <br />NOPV Abatement Requirements <br />page 4 <br /> <br />analytical results from samples collected from well M-9 have Holt detected <br />any Cyanide occurrence. <br />The Division directs BMG to reevaluate its approved program for ground <br />water monitoring, sampling and analysis for the tailings dispospl area. <br />At a minimum the Division believes that an expanded monitoring program, <br />including additional ground water monitoring wells, should be implemented <br />to ensure continuous penetration of the ground water table. Further, the <br />Division believes that all tailings area monitoring facilities hould be <br />sampled monthly and the analytical results reported expeditiously to the <br />Division. This evaluation report shall be submitted to the Division as a <br />technical revision prior to May 29, 1992. <br />Further, BMG shall develop and submit a tailings effluent leakage <br />interception, containment and treatment plan, to be implemented in the <br />event of contaminant migration from the tailings area. This contingency <br />response plan should specify methods to remedy contamination of ground <br />water, surface water and soil. This plan shall be submitted to the <br />Division as a technical revision prior to June 15, 1992. <br />Status: Satisfied - BMG has committed to development of remedial plan <br />in letter of April 16, 1992. <br />- The requirements for monitoring plan modif cation <br />were only advanced by the Division on Apri 21, 1992. <br />- BMG verbally committed to modify the monitoring plan <br />on April 22, 1992. <br />Deadlines: Submit evaluation report of existing tailings area round <br />water monitoring plan with proposed modifications t the <br />Division by May 29, 1992, as a technical revision. <br />Submit contingency leakage response plan to the Division by <br />June 15, 1992, as a technical revision . <br />(7) Modification of Ore Processing Methodology: <br />BMG's preliminary suspicions of altered metallic ore content, ar~d the <br />coincidental failure of the designed processing cyanide recover circuit, <br />are indications that the ore processing methodology currently b ing <br />applied by BMG may require significant modification. If BMG de ermines <br />it necessary to modify its ore processing methodology, BMG shall submit <br />appropriate applications to the Division. Appropriate permit <br />modifications, supported by comprehensive analytical results and design <br />evaluations, shall be submitted by BMG to the Division for review and <br />approval no later than 45 days following completion of the cyanide <br />detoxification of the tailings areas contents, described in item (4) <br />above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.