My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32547
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:29 PM
Creation date
11/21/2007 1:24:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/24/1992
Doc Name
DRAFT SCOPE OF WORK 3RD PARTY MONITORING CONTRACT
From
MLRD
To
BATTLE MTN GOLD PN M-88-112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iiiiiiiuiiuiuiii <br />STAT~OF <br />RADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman SI.. Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />rax:303 632-Bt06 <br />OF COO <br />~~~9 <br />~e~~~,. <br />•~v~• <br />~ /8l6 ~ <br />Roy Romer, <br />Gwemor <br />Michael B. Lonq. <br />Division Drteaor <br />DATE: August 24, 1992 <br />T0: The Battle Mountain Gol rm File (Permit M-88-112) <br />FROM: Jim Pendleton <br />RE: DRAFT "Scope Work" - hird Party Monitoring Contract; <br />Battle Moun rtes Inc. San Luis Project; Permit M-8r~-112 <br />Having discussed my concerns regarding the original proposal with Dr Ann S. <br />Maest, PhD of RCG/Hagler, Bailly Inc. late on Friday, August 21, 199 I <br />propose the following "Scope of Work" be included in the "Third Part <br />Monitoring" contract to be executed between Battle Moun~ain Resource Inc. <br />and RCG/Hagler, Bailly Inc. This draft reflects significant modific tion of <br />the scope of work proposed by Dr. Maest and a minor addition to the stimated <br />Direct Costs. <br />SCOPE OF WORK <br />A <br />Sampling Overview <br />(As included in Paragraph 3.2 of Dr. Maest's proposal) <br />8 <br />Sampling and Analytical Protocol <br />(As included in Paragraph 3.3 in Dr. Maest's proposal, <br />with the deletion of the last sentence) <br />C <br />Pre-Sampling Activities and Reports <br />Pre-sampling activities (Task ll will include: Preparinglfor <br />sampling at the site by completing the safety training de med <br />appropriate, and administered the Colorado Division of Mi erals & <br />Geology's Office of Active Mines (previously "the Colorad Division <br />of Mines"). The appropriate certification will be obtain d and <br />maintained by the contractor for presentation upon reques The <br />Contractor will also complete whatever safety indoctrination is <br />required and administered by BMRI at its mine site. No c st will <br />be invoiced by the contractor for this mandated activity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.