Laserfiche WebLink
' EXHIBIT E <br />- Reclamation Plan <br />' The reclamation of the land at the site of the Dallas Gravel Pit will be performed in 3 <br />phases in coordination with the proposed mining plan. The post-mining land use of the <br />rehabilitated areas will be reclaimed to duplicate the surrounding terrain and return the site <br />' to it's original wildlife habitat use.~eclamation will take place following each phase of the <br />mining operation and prior to commencement of the next phaseSPhase l will require <br />' approximately 1 to 2 years to extract the desired amount of material available in that area, <br />Phase 2 will necessitate up to 10 years and Phase 3 may call for as long as 10 years also. <br />' The type and method of reclamation will be the same for each phase, however, each <br />successive phase will be larger than the previous. Phase 1 will impact approximately 3.9 <br />acres at the far eastern portion of the parcel, Parcel 2 will disturb close to 8 acres in and <br /> azound the limits of the existing operation and Parcel 3 will affect close to 7.7 acres of <br />' previously undisturbed land west of the existing site within the permitted 50 acre parcel. <br />' Prior to the start of gravel extraction operations, the top 4 to 6 inches of topsoil will be <br />k <br />il <br />l <br />i <br />i <br />i <br />i <br />d <br />d <br />d f <br />h <br />l <br />ff <br />Thi <br />k <br />il <br />d <br />5~ <br /> remove <br />an <br />p <br />or <br />t rec <br />stoc <br />ater use <br />n t <br />e p <br />amat <br />on e <br />orts. <br />s stoc <br />p <br />e <br />-mater <br />al <br />e <br />shall be stabilized with a cover crop of Western Wheatgrass (4 Ibs/ac), Muttongrass (4 ~ ~,t2 <br />£d~""i <br />t ]bs/ac) and Yellow Sweetclover (1 Ib/ac). ~ <br /> Upon commencement of site rehabilitation all rejected oversized material will be buried <br />' prior to final grading. The site will be graded to blend in with the surrounding topography <br /> with slopes no steeper than 2:1. Topsoil will be redistributed evenly throughout the <br /> disturbed areas to a minimum depth of 4 inches. The soil surface of the pit area and access <br />' routes will be scarified after final grading by ripping or disking the soil along the contours <br /> of the slope. The soil surface will be considered scarified if depressions are created 2 to 4 <br /> inches deep and are spaced approximately 4 to 6 inches apart. Surface roughening can also <br />' be accomplished by tracking the soil with a dozer working perpendicular to the contours <br /> of the slope. Care will betaken to not drive any vehicles over scarified surfaces. <br />' The disturbed areas will be fertilized with 80 lbs.facre of nitrogen and 50 Ibs./acre of <br /> phosphorous prior to seeding and again one year following the seeding. <br />' All disturbed azeas will be seeded and mulched within 14 days after final grade is <br /> established on any portion of the site not otherwise permanently stabilized. The mulch <br />' shall be clean, weed and seed free and long stemmed hay. The mulch will be applied evenly <br /> at a rate of 2 tons per acre. At least 50% of the mulch, by weight, should be 10 inches or <br /> - more in length. The mulch will be anchored by crimping or with the aid of tackifiers or <br />' nets. <br /> <br />1 <br />