My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24, 2003 -34- 003-2203.7 <br />• 5.0 GEOSYNTHETICS CQC SUBMITTALS <br />Geosynthetics CQC submittals reviewed by Golder included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, welding rod certificates, geogrid <br />certificates, and geotextile certificates. Golder's inventory control, summarizing CQC certification <br />received for each roll of geomembrane received for the Phase Nb PSSA upper and lower liner <br />systems, is presented in Appendix J-1. All geosynthetic material used as part of the Phase Nb PSSA <br />construction met project specifications. <br />5.1 Geomembrane Installation Personnel Resumes <br />Golder reviewed the resumes of Poly-Flex installation personnel to verify that the installation <br />superintendent and the seaming personnel possessed sufficient experience as required by the project <br />specifications. Review of the installation personnel resumes indicated that key personnel had <br />experience sufficient to meet or exceed project specifications. Geomembrane personnel resumes are <br />presented in Appendix J-2. <br />• 5.2 Geomembrane CQC Documents <br />CQC documents submitted by Poly-Flex included resin supplier certificates and geomembrane <br />manufacturer resin certificates, geomembrane roll certificates, and welding rod certificates. Golder <br />reviewed CQC documents prior to geomembrane placement and verified that the documentation was <br />complete and that the material properties and CQC testing frequency required by specifications were <br />met. <br />5.2.1 Resin COC Certificates <br />LLDPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br />Chevron Phillips Chemical Company, at a frequency of one per rail car shipment. Golder reviewed <br />these certificates prior to geomembrane placement. Geomembrane used on this project was produced <br />from nine batches of resin. The geomembrane manufacturer also performed density and melt index <br />tests of the resin supplied by Chevron Phillips Chemical Company to verify material properties prior <br />to geomembrane manufacture. The CQC certificates provided by the resin manufacturer are <br />• presented in Appendix J-3. <br />I:\00\E203\W00\FnICertP55A0603\0032203.Od00.0]143Rep.doc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.