Laserfiche WebLink
June 24, 2003 -21- 003-2203.7 <br />3.4 Undergrouud Workings Geogrid <br />A summary of underground working remediation for the Phase Nb PSSA is presented in Table 3. <br />Additional remediation details aze presented in Section 4.2.1. <br />3.5 High Volume Solution Collection System Riser Foundation <br />Geosynthetics installation for the High Volume Solution Collection System vertical riser pipe <br />foundation was performed by Ames, and included deployment of 12-ounce non-woven geotextile and <br />GCL. Ames installed approximately 400 square feet of GCL and 400 square feet of geotextile to <br />construct the HVSCS riser foundation. <br />u <br /> <br />~:~ao~zzoawooov+sic.rtrssnocosaoaxza3.oaoo.o~a+axep.a~ Golder Associates <br />