Laserfiche WebLink
<br />Reclamation cost Estimate Associated with Technical Revision No. 1 March 15, 2001 <br />Permit No. M-1999-005 <br />All-Rite Paving and Redi Mix <br />North River Pit <br />Item- Remove staging area pad and <br />spread the material on lake bank slope. <br />D8-dozer est.13, 800 cu yds $8,674.00 <br />Direct Cost $8,674.00 <br />Indirect Cost (18.5%Direct) $1.605.00 <br />Total Reclamation Cost $]0,279.00 <br />Administrative Fee (Rule 4.2.1(5)5% 514.00 <br />$10,793.00 <br />Additional Financial Warranty Amount $10,800.00 <br />M \ossWHD\IdoUieclamalion cost Estimate Associated with Technical Revision No.doc <br />