My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32345
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:24 PM
Creation date
11/21/2007 1:19:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Enforcement
Doc Date
3/22/2001
Doc Name
BULLDOZER WORK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+, <br />PROJECT IDE NTIFICATION <br />Task # : 001 <br />Date : 03/22/2001 <br />User : LDO <br />• iiiriiiiiiuiiiiu~ <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado Permit/job# : M-1999-005 <br />County :Otero Abbreviation :none <br />Site :North River Pit Filename : M005-001 <br />Agency or organization name :OMG <br />Permif or other job action :Bond Increase due to TR-1 <br />Task description :Spread staging area pad materials on lake bank slope <br />HOURLY EQUIPMENT COST <br />Cosf Breakdown <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br /> Utilization <br />OwnershipcosUhour : $43.30 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cost/hour : $2799 NA <br />Total unit cosUhour : $137.56 Total fleet cosUhour <br />$137.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 13,900 CCY factor : 1.125 volume : 15,638 LCY <br />Source of estimated volume : TR-1 and Inspection Report <br />Source of estimated swell factor : cat hndbk <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill ; 0, 75 (avg.) <br />Average push distance : 150 feet Material consistency : 0,90 (Cat HB) <br />Unadjusted hourly production : 685.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description ; Job efficiency : 0.83 (lshifUday) <br />Compacted /ill or embankment Spoil pile : 0.70 (tnd-mf) <br /> Push gradient : 1.02 (Cat HB) <br />Average push gradient : 1.00 °b (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,035 feet Material weight : 0.90 (Cat HBJ <br /> Blade type: 1,00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.36 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 24798 LCY/hr <br /> Adjusted fleet production : 247.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 63.06 Hours <br />~ Unit cost : $0.555 /LCY Total job cost : $8,674 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.