My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:01:22 AM
Creation date
11/21/2007 1:19:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix N
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder Associates Inc. <br />44 Union Boulevard. Suite 300 <br />Lakewood. CO USP. 80228 <br />Telephone (303) 980-0540 <br />fax (303) 985-2080 <br />June 3, 2003 <br />Cripple Creek & V ictor Gold Mining Company <br />P.O. Box 19l <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: RISER BASE PLATES - RFI NO. 101 <br />Dear Ron: <br />~~~~~~ <br />Our Ref: 003-2203 <br />Golder Associates Inc. (Golder) has prepared this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) regarding Request For Information (RFI) No. 101 submitted by Ames <br />Construction. RFI No. ]Ol requests grading the 10' x 10' area beneath each base plate to be flush <br />with the rest of the sump pad. The original design required recessing the base plate area <br />approximately 6" for placement of transition materials beneath the base plates. <br />Golder has reviewed the request presented in RFI No. 101 and agrees with the request as this will: <br />1. facilitate field fitting the collection pipe to the risers; and <br />2. reduce the amount of geomembrane welds in the sump. <br /> <br />This RFI is approved provided that additional haunching of the collection pipes be provided. Each <br />pipe should be hand packed to provide adequate support. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />,~ <br />=~ <br />Jo]~n F. Lupo, Ph.D., P.E. <br />`Sr. Project Manager <br />C \OOCUmen[x and Senings\mnordwaldLLacJ Stteinys\TemDorery tmemet Files\OLKi T00]2303 0100 0]at Odurplmes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.