Laserfiche WebLink
• Golder Associates Inc. <br />dC Union 8out2vard, Suits SC4 <br />Lckeevccd. CO USF: 2ii"iP, <br />ir~epncne (.'.0 ) o°G-OE:10 <br />Far ;J03i 9E5-2G?0 <br />June 2, 2003 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: RISER PIPE MODIFICATION - RFI NO. 104 <br />Dear Ron: <br />R~--_ <br />_'~~~l~r <br />f~S®CC~2~$~;S <br />Our Ref: 003-2203 <br />Golder Associates Inc. (Golder) has prepared this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) regarding Request For Information (RFI) No. 104 submitted by Ames <br />• Construction. RFI No. 104 presents a proposed modification to the riser pipe configuration. The <br />proposed modification consists of replacing the 26" HDPE pipe lengths entering the Phase IV PSSA <br />~ sump with steel piping. <br />Golder has reviewed the proposed modification and agrees that steel pipe may be used to replace the <br />HDPE pipe lengths in the sump. The steel pipe must have the same wall thickness (schedule 40) as <br />the steel stub pipe material. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />~- <br />~~ ;; <br />~° ~°' _ <br />John F: Lupo, Ph.D., P.E. <br />Sr. Project Manager <br />i ~oawoawioo~oo3zwa.omo.ovaosasorytpe.ao~ <br />