My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:01:22 AM
Creation date
11/21/2007 1:19:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix N
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Golder Associates Inc. <br />dC Union 8out2vard, Suits SC4 <br />Lckeevccd. CO USF: 2ii"iP, <br />ir~epncne (.'.0 ) o°G-OE:10 <br />Far ;J03i 9E5-2G?0 <br />June 2, 2003 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: RISER PIPE MODIFICATION - RFI NO. 104 <br />Dear Ron: <br />R~--_ <br />_'~~~l~r <br />f~S®CC~2~$~;S <br />Our Ref: 003-2203 <br />Golder Associates Inc. (Golder) has prepared this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) regarding Request For Information (RFI) No. 104 submitted by Ames <br />• Construction. RFI No. 104 presents a proposed modification to the riser pipe configuration. The <br />proposed modification consists of replacing the 26" HDPE pipe lengths entering the Phase IV PSSA <br />~ sump with steel piping. <br />Golder has reviewed the proposed modification and agrees that steel pipe may be used to replace the <br />HDPE pipe lengths in the sump. The steel pipe must have the same wall thickness (schedule 40) as <br />the steel stub pipe material. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />~- <br />~~ ;; <br />~° ~°' _ <br />John F: Lupo, Ph.D., P.E. <br />Sr. Project Manager <br />i ~oawoawioo~oo3zwa.omo.ovaosasorytpe.ao~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.