My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-05_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-05_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:17:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/5/2003
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`c Golder <br />ASSOCIc'1teS <br />Apri122, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 13: April 13 through Apri119, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of April 13 <br />through April 19, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate da}~time ]ow <br />temperatures ranged from 25° F to 39° F, and highs ranged from 47° F to 66° F. Snow was recorded <br />on April 15 and 19. Weather observations were made on seven days of this seven day reporting <br />period. <br />Construction S,.tn°ps?s <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IV b <br />and c construction. Agnes conducted Phase IVb and c consti action activities on six days of this seven- <br />day reporting period (April 14 through April 19, 2003). <br />Phase IVb <br />Ames began haul and placement of Soil Liner Fill (SLF) in the Phase N b PSSA and compacted <br />material by use of aplate-tamping machine. Ames also hauled and placed $edding Fill (BF) to the <br />south outboard bench of the Phase IV b PSSA limits. <br />Ames began excavation of the upper geomembrane anchor trench of the PSSA. Ames opened <br />approximately 1100 feet of southern ore slope anchor trench from the southwest comer of the PSSA <br />trending to the east, and approximately 1200 feet of west SLF anchor trench trending to the north. <br />
The URL can be used to link to this page
Your browser does not support the video tag.