CEMEX, Inc Lyons Mine Permit No. M-1977-208 <br />Bond Calculation <br />approximately 30 miles from the plant site. These disposal costs are included in the cost <br />estimate. <br />Response #4 <br />Unit costs have been adjusted to Division-provided values where available. <br />Response #5 <br />An approximate scale has been added to the schematic plan provided for this submittal. <br />However, dimensions were taken from the engineering drawings, not scaled from a plan <br />view map. <br />Response #6 <br />This column called "concrete in place' on Tables 4 and 5 is the sum of the three <br />adjoining columns: Silos, Buildings, and Foundations. These were itemized because <br />different demolition costs were applied to the three categories. In the following <br />submittal, the "concrete in place' column has not been shown on Tables 4 and 5. <br />Response #7 <br />As required by federal regulations, CEMEX appropriately disposes hazardous waste <br />within 90 days of when the waste is produced; therefore, no hazardous waste will be on <br />site at the time of plant closure. Chemicals used in blasting and processing will be <br />consumed prior to plant closure. <br />CEMEX has provided an itemization of hazardous materials currently stored on the site. <br />All of the chemicals are in quantities that are less than the required reportable value by <br />federal regulation. This list is located in Appendix D. <br />Response #8 <br />Line items including mobilization/demobilization, insurance, administration, engineering, <br />performance bond, and profit have been added in the revised cost estimate. <br />Cost Estimate Details <br />The overall cost estimate is provided in Table 1. This includes the subtotaled costs from <br />Tables 2, 3 and 7. Tables 4, 5 and 6 include additional data in support of Table 3. <br />The site was divided into two areas for the estimate; the north part of the site is referred <br />to as the Grinding portion, and the south part is referred to as the Burning portion. This <br />division between the two processes allows a separate bond calculation in the event that <br />the plant is modified so that only the Grinding process occurs in the future. The drawing <br />included with this report depicts the division. <br />Included in the grinding portion of the plant are the administration building, the mill <br />building, the central control building, raw material silos, and support buildings. The <br />complete list is included herein on Table 5. Included in the burning portion of the plant <br />are the burner building, the coal unloading building and coal silo, the primary and <br />secondary crushers, the bag houses, and support buildings. The complete list is <br />included herein on Table 6. <br />-2- <br />