Laserfiche WebLink
The Cash Mine shaft will be rehabilitated to the extent necessary to allow <br />its use for ventilation and/or as an emergency escape route, while <br />retaining the potential for possible future hoisting of ore. Surface <br />structures present at the Cash Mine (already a part of MLRD Permit No. <br />M-S3-141) when rehabi!$ated to serviceable condition wi!! be utilized in <br />the proposed operations. <br />Mount Royale Ventures, LLC proposes to utilize the existing roadway that <br />ascends from the Mount Royale portal area up to and through the Who <br />Do Mine area as a primary ore haulage route for hauling on; (by truck) to <br />the Gold Hill Mill. That portion of the roadway that extends northerly from <br />the Who Do Mine area that will require improvement (i.e., increased <br />switchback radii or cross-sectional profile) and/or enhanced maintenance <br />(such as repetitive grading and Gearing of rocks, etc.) to facilitate safe <br />truck haulage has been incorporated into the permit area. In conjunction <br />with the planned use, the roadway will in all areas be maintained such <br />that it conforms to applicable Mine Safety and Health Administration <br />(MSHA) standards. <br />Mining Oaerations: Primary mining operations would be carried out <br />through the Mount Royale Adit(s), to incude mine access/entry, ore <br />haulage, and waste rode removal. It is anticipated that the adit cross- <br />section (nominal 8' width x 8' height). will remain as developed during the <br />exploration phase. The minor volume of water generated through face <br />drilling activity (consistent with that encountered during exploration) will <br />continue to be collected and managed (evaporated) internal to the mine <br />at a face area sump and no adit discharges are anticipated. <br />While to date the exploration activity has utilized rubber-tired equipment, <br />the Mount Royale production edit(s) will be converted to a track-based <br />operation, and development and production mining will be conducted with <br />standard underground mining equipment such as jadklegs, mucking <br />machines, and ore cars. The Mount Royale Adit development will provide <br />access to other production areas underground. As necessary, ft is <br />anticpated that the waste rock stockpile will be expanded easterly from <br />the portal and/or downslope within the proposed permit area boundaries <br />as mine development and ore production commences. However, due to <br />the primary mining technique (resuing) to be employed on the narrow vein <br />structures, Mount Royale Ventures, LLC does not anticipate that <br />sign cant volumes of waste rock will be generated beyond that <br />necessary to access and explore the production areas. <br />Application <br />