Laserfiche WebLink
the Who Do 100-Level waste rods dump. Any temporary structures will <br />be dismantled/removed. <br />Waste Rock: The Who Do Mine area waste rods pile reclamation will be <br />carried out as desribed above (in conformance with the approved plan to <br />include any increased waste rods volume deposited subsequent to <br />approval). <br />lather. Miscellaneous materials and scrapftrash will be removed from the <br />area and either salvaged or disposed in accordance with applicable <br />regulations. The Donald R. and Bellevue Adits will be secured with a <br />locking (bat-accessible) permanent steel gate. Similarly, the Who: Do <br />shaft will be equipped with a secure, locking cover. <br />Mount Rova/e Adff Area: <br />Structures: Decommissioning of the Mt. Royale No. 1 portal area will <br />commence wRh the demolition and/or removal of the miner's dry and mine <br />office structures. [Note: Although there may tie salvage value associated <br />with structural and other materials and all or a certain portion of such <br />materials may be sold for salvage value or recycled, it has been <br />conservatively assumed that all such materials will be disposed and no <br />salvage value realized]. Decommissioning will be accomplished by <br />removing and appropriately disposing all internal contents, removal of the <br />structural shell and structural members, and fragmentatiorVremoval of any <br />concrete slab foundations or footers. Broken concrete (inert) debris will <br />be placed along the tce of the waste rock pile for eventual burial to be <br />accomplished through recontouring activities. <br />The ore biMoadout structure and the warehouse/shop structure will <br />remain intact. Access roadways wRhin the portal area will generally <br />remain present as during mining, subject to minor reconfigurations to <br />accommodate waste rock pile recontouring in this area. <br />Similarly, the portal feature will remain intact to allow future access and <br />facllitate portal plug monitoring and maintenance. However, a secure, <br />steelyated (bat accessible) closure will be installed. <br />If the Mount Royale No. 2 Adit were ultimately developed with supporting <br />surface infrastructure, the associated office/changehouse and transfer <br />bin/loadout would be dismantled and removed. The Mount Royale No. 2 <br />portal feature would remain intact for (potential) future portal plug <br />maintenance accessibilty; however, a secure, steel-gated (bat accessible) <br />closure would be installed. <br />Waste Rock: Recontouring of waste rodk "Area A" (and "Area B", if <br />constructed) will incorporate slope reduction in conjunction wfth teracng <br />on the outslope face(s) followed by appropriate revegetation processes. <br />Existing run-on and run-off controls will remain in place to mitigate erosion <br />potential. <br />Exhibit D - ReWamadon Plan ~ <br />