My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31994
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:15 PM
Creation date
11/21/2007 1:10:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Enforcement
Doc Date
10/10/2002
Doc Name
Abatement Compliance
From
National King Coal LLC
To
DMG
Violation No.
CV2002014
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h k'CI~'~ hf-1.X NLI. '3lBb'b24VJ.5~ ~Ct. b7 2AlJl'J2 62: 21Pf`i Y2 <br />143k(1 T-ii~h.v.... 7 A ~ <br />!/V.UUL_YVJY <br />Uctaber 07.2002 <br />nor. To^; ??ird <br />T.79ti~.:o1 Y:.. n <br />_ .,u <br />. :~~ Lim i 4V <br />SUBJECT: Status of Tterr±c r;±pd by Calorado Division of ivlinerals and Geology <br />Dear Tom, <br />Craclt filling-was stopped on October 03, 2002 ?f??* apnrex;:^ate?•r ? ~Scy v>.„~c of e;ll <br />was piaced. T tte rile will be monitored over the winter to determine i f the primat}• <br />sett(emen? is complete. The shale/can~ic±~nP o;~erburden thickness is approximately 300 <br />feet. A monitoring point is approximately 100 feet from Che work area and indicates <br />0.09 feet of settlement in ten months. Scheduled readings of observation points will be <br />made Uctober 15, 2002. <br />The propane line was tested September 24, 2602 and held 15 psi. All connections were in <br />good condition. <br />The sewer line was inspected with a television camera on September 24, 2002 and an <br />obstruction was encountered. The line was collapsed and repaired. The collapse was <br />probably due to nearby construction of a metal building. A second inspection will be <br />made at the owner's convenience. <br />Repair oftwo vertical cracks was to be made by the owner as they felt the crncks were <br />not related to the underground mining. <br />Monitoring points on the sidewalk and the wall were placed August Ol, 2002. <br />The owners have been very cooperative. Scheduling of third party work is done to <br />minimize lost time from work as both Mark and Julie Crawford are working full-time <br />working full time. <br />Sincerely <br />Harry L. ie5'~ bert, Consultant <br />
The URL can be used to link to this page
Your browser does not support the video tag.