Laserfiche WebLink
<br />Battle Mountain Gold <br />NOPV Abatement Requirements <br />page 3 <br /> <br />(6> Cyanide Detection, Interception, Containment and Remedial Tre~tment: <br />BMG originally proposed the construction of a heap leach at t e San Luis <br />mine. In 1988, BMG amended its permit application to delete he heap <br />leach and implement a contained vat processing system. This mended <br />process was designed to yield detoxified tailings for disposa within the <br />tailings area. BMG replaced the originally proposed heap lea h double <br />liner system with leak detection with a composite liner syste without <br />leak detection. This amendment was approved by the Division elying upon <br />BMG's representation that tailings Cyanide levels would note teed 3.8 <br />ppm WAD Cyanide and 4.4 ppm total Cyanide. <br />In the absence of a leak detection system, migrating leakage rom the <br />tailings disposal ponds would only be detected by the five gr and water <br />monitoring wells (M-5, M-6, M-7, M-8 and M-9) located in the icinity of <br />the tailings area. Since the inception of the approved monit ring <br />program, only monitoring well M-9 has intercepted ground water. The <br />analytical results from samples collected from well M-9 have n t detected <br />any Cyanide occurrence. <br />The Division directs BMG to reevaluate its approved program fo ground <br />water monitoring, sampling and analysis for the tailings dispo al area. <br />At a minimum the Division believes that an expanded monitoring program, <br />including additional ground water monitoring wells, should be 'mplemented <br />to ensure continuous penetration of the ground water table. F rther, the <br />Division believes that all tailings area monitoring facilities should be <br />sampled monthly and the analytical results reported expedition ly to the <br />Division. This evaluation report shall be submitted to the Di~ision as a <br />technical revision prior to May 29, 1992. <br />Further, BMG shall develop and submit a tailings effluent leak ge <br />interception, containment and treatment plan, to be implemente in the <br />event of contaminant migration from the tailings area. This c ntingency <br />response plan should specify methods to remedy contamination o ground <br />water, surface water and soil. This plan shall be submitted t the <br />Division as a technical revision prior to June 15, 1992. <br />Status: Satisfied - BMG has committed to development of remed~al plan <br />in letter of April 16, 1992. <br />- The requirements for monitoring plan modi ication <br />were only advanced by the Division on April 21, 1992. <br />- BMG verbally committed to modify the moni oring plan <br />on April 22, 1992. <br /><7) Modification of Ore Processing Methodology: <br />BMG's preliminary suspicions of altered metallic ore content, nd the <br />coincidental failure of the designed processing Cyanide recove y circuit, <br />