Laserfiche WebLink
I told him he should check to see if any drainage plans would be altered, he said they would <br />not. <br />I noticed that the location of Topsoil Stockpile D had been changed, and suggested he review <br />the initial geotechnical investigation for that area to ensure there had not been any concerns <br />with that location. I told him he didn't need to do that now, but it would probably come up <br />in the adequacy review. <br />st.s~oaos96.wF <br />C-96-016 Mcmo to File 2 August 8. 1996 <br />