Laserfiche WebLink
DE-RL04-96GJ89467 <br />• (c) If preparation and filing of an Exploration Plan for the entire operation is dependent upon <br />factors which cannot or will not be determined except during the progress of exploration activities, partial plans <br />may be submitted and approved from time to time; rop vided, however, that the Lessee shall not perform <br />exploration activities not described in an approved plan. <br />(d) Changes may be made in the approved Exploration Plan by mutual written agreement of the <br />Lessee and the Contracting Officer. Approval is contingent upon the Lessee notifying all other appropriate <br />agencies (as outlined in Appendix "C") of the proposed changes. <br />XIII. MINING PLAN. <br />(a) Prior to constructing any surface installation or commencing mine development on the leased <br />lands, the Lessee shall file with the Contracting Office three (3) copies of a plan for the proposed mining <br />operations and shall obtain the Contracting Officer's approval of such plan. Such mining plan shall be consistent <br />with the "Mining Permit Application" (hereinafter "Application") to be filed with the Colorado MLRB in <br />accordance with "Rule 1.4" and "Rule 6" of the "Mineral Rules and Regulations" of the Colorado MLRB, as <br />• these rules may be amended. The Mining Plan shall include all information required by the "Application", and <br />in addition, must specifically include the following information: <br />(1) Asite-specific environmental analysis; <br />(2) A description of specific measures to be taken to assure compliance with the requirements <br />of Article XI "ENVIRONMENTAL REQUIREMENTS", including methods of reclamation <br />contemplated by the Lessee; and <br />(3) The specific information outlined in Appendix "C" of this lease. <br />(b) All Mining Plans submitted to the Contracting Officer pursuant to this Article XIII and all <br />proposed activities contained therein shall be reviewed by DOE in accordance with 10 CFR Part 1021 "National <br />Environmental Policy Act Implementing Procedures". <br />(c) [f preparation and filing of a Mining Plan for the entire operation is dependent on factors which <br />cannot or will not be determined except during the progress of mining activities, a partial plan may be submitted <br /> <br />-6- <br />