Laserfiche WebLink
• ~ <br />9. All sampling, analysis and reporting shall comply with the approved <br />TR-006 protocol. <br />D. <br />E. <br />F, <br />10. The third party sampling contractor shall document its cbmpliance with <br />the approved TR-006 protocol. <br />Reports <br />1. A summary report will be prepared subsequent to the completion of <br />each sampling event and the receipt of the analytical r suits from the <br />chosen laboratory. <br />2. The summary reports will include a summary of the sam ling activities, <br />sampling observation documentation, "chain of custody" ocumentation, <br />the verbatim analytical results from the laboratory, wit comments on <br />unusual or unexpected results, and recommendati ns for minor <br />sampling changes, if indicated by the analytical results.) <br />Malysis oC Samples <br />1. Samples collected hereunder shall be analyzed by th~ independent <br />analytical laboratory designated by DMG for the followi g parameters: <br />Total Cyanide, WAD Cyanide, and Copper. ){~iitrate/Nitrite <br />parameters shall also be analyzed during the second and (third sampling <br />rounds, only in accordance with the approved analytic l protocol set <br />forth in TR No. 006. <br />2. In accordance with the approved TR No. 006 protocol, "field blanks", <br />"rinse blanks", and "duplicate samples" will be submitted for analysis by <br />the third party sampling contractor, at the contractor's iscretion, with <br />the concurrence of the DMG project manager. <br />3. If analytical interferences are suspected to exist, t e third party <br />sampling contractor may direct the analytical laboratory to perform <br />analysis for additional parameters, with the concurrent of the DMG <br />project manager, after notification of BMRI. <br />Submittal of Invoices <br />1. The Contract for Environmental Sampling Services i requires that <br />invoices be submitted to DMG's project manager. <br />-5- <br />